EZ Link Taiwan Handle Wind Turbine Gearbox to Belgium
19th November 2026
EZ Link (PCN members in Taiwan) have recently handled a wind turbine gearbox set via RORO vessel from Taichung City to Antwerp in Belgium via Keelung Port.
The gearbox has a weight of 64,000kg and dimensions of 4.25 x 3.70 x 3.40m.
EZ Link ensured seamless operations and their project team supervised all procedures and safe rigging.
Loading cargo onto a hydraulic modular trailer using a 300tn mobile crane at the site. EZ Link arranged lengths of spread beams matching the exact width of the cargo for the slings so the cargo could be loaded and unloaded as vertically as possible.
Careful lashing and securing was required on the truck during the inland haulage transportation from Taichung City to Keelung Port. The distance was nearly 200km with heavy cargo restrictions meaning transport could only take place from 22:00 - 06:00.
Cargo monitoring whilst moving from the trailer onto the MAFI with meticulous lashing and securing performed at shipside.
EZ Link's professional team smoothly and safely handled the project from the client's warehouse with all involved parties happy with their timely and reliable services as always.